Handover delays at construction sites are driven by snag closure cycles, not by construction completion. Today, snagging is a coordination dance between CM, HPM, and vendors with handoffs that each take days. The module collapses this into one digital workflow: HPM raises snag with photo and criticality; vendor auto-assigned based on WIR history; rectification submitted with root cause and preventive action; CM verifies; HPM approves de-snag; handover scheduled when star snags closed.
- ·Tower nearing OC milestone — pre-handover walkthrough
- ·Pre-snag inspection by inhouse team
- ·Customer joint snag inspection
- ·Snag closure submitted by vendor or in-house team
- ·Handover document pack ready
- ·Possession-date scheduling
- ·Drawing and spec from M07 and M09
- ·WIR history from M19 (for known issue areas, predicted defects by vendor and trade)
- ·Customer record from M24
- ·OC and statutory compliance from M04
- ·Snag list per unit with photo and location
- ·Vendor closure evidence
- ·Inspection request -WIR
- ·Joint inspection sign-offs
- ·Handover document pack
- ·Predictive snag list from quality patterns and WIR history
- ·Mobile snag capture with photo, location, severity, responsible trade
- ·Snag closure workflow with evidence
- ·Joint customer inspection (Unit Visit UV)with structured sign-off
- ·Handover pack auto-assembly (warranties, manuals, certificates, keys)
- ·Possession-date readiness check
- ·Handover SoP with snag taxonomy and severity + Possession SoP
- ·Critical snag SoP — what blocks handover
- ·Handover document pack SoP
- ·Possession-date readiness SoP (PDL + 45 days)
- ·Critical snag must close before handover
- ·Snag severity drives closure SLA (critical, major, minor)
- ·Snag responsible trade auto-identified from drawing and WIR history
- ·Possession scheduled only after OC / part OC plus handover-pack readiness
- ·Snag list per unit with status
- ·Closure evidence record
- ·Joint inspection sign-off
- ·Handover document pack (warranties, manuals, certificates, keys)
- ·Possession scheduling record
- ·Unit status updated through snag → closure → handover lifecycle
- ·Customer record updated on possession
- ·Vendor performance updated on snag closure quality
- ·Possession triggers BelleVie provisioning in M24
- ·Snag patterns feed Vendor 360 in M13
- ·Snag patterns feed quality predictive intelligence in M19
- ·Handover triggers asset register update in M23
- CMSnagging schedule, vendor assignment, verification
- HPMUnit-by-unit snagging, de-snag approval, handover acceptance
- VendorRectification with evidence
- CustomerReceives unit handover
- 01Snagging schedule (CM → HPM)
- 02Unit snagging with checklist and photo evidence
- 03Vendor auto-assignment from WIR history
- 04Snag rectification with root cause and preventive action
- 05Verification (verified / reject)
- 06De-snagging schedule when threshold reached
- 07De-snag approval by HPM
- 08Handover schedule when non-star snags closed
- 09Unit handover to HPM
Snagging cycle is 6–12 weeks per tower with handoff delays at every step.
Snagging cycle compresses; auto-assignment and digital verification remove handoff lag.
BA59 Iris G U104 — HPM raises flooring snag (hollow dado tiles) 14 May 10:02 AM. Auto-assigned to Sterling (per WIR history) — also flagged in Vendor 360 from quality pattern. Rectification submitted 14 May 11:46 AM with root cause "subfloor moisture" and preventive action. CM verifies; closed at 12:08 PM. Portfolio: 1,124 ready · 593 open · 130 critical.
- ·Snagging schedule
- ·Unit snag checklist with photos
- ·Vendor assignment log
- ·Rectification records
- ·Verification log
- ·De-snag approval
- ·Handover acceptance record
Snagging is a coordination dance. CM raises schedule; HPM has to be available; vendor has to rectify; verification has to happen. Each handoff has its own delay. Critical snags do not bubble up.
No external system integrations — module operates on internal records.