Budget · VE
Continuous budget tracking from concept through detail design, with value engineering trade-offs captured as data.
Budget evolves from concept design (CD) through detail design (DD) to final. Value engineering reviews happen at each milestone. The module captures cost/time/quality trade-offs as structured data so VE decisions are auditable. Variance against the DD-locked base is monitored continuously; alerts fire when WO commitments approach budget thresholds. Extending Bandhoo for budget continuity rather than replacing.
- ·Concept design approved — concept budget initiated
- ·Detail design closure — DD budget finalisation
- ·BOQ updated from M10
- ·WO release in M14 (commitment update)
- ·Value engineering review milestone
- ·Variance threshold breach — alert fires
- ·Concept design package from M07
- ·BOQ versions from M10
- ·Rate library and historical comparables from Bandhoo
- ·Committed WO values from M14
- ·Amendment values from M15
- ·BOQ snapshots at concept, CD, DD milestones
- ·VE proposals from Design and DCO
- ·Cost-impact analyses for spec deviations
- ·Bandhoo rate library snapshots
- ·Budget evolution tracking — concept to CD to DD to final
- ·Value engineering workflow with cost/time/quality trade-off captured as data
- ·Variance monitoring — DD baseline against running commitment from WOs and amendments
- ·EWS on commitment threshold breach
- ·Sensitivity analysis against rate, quantity, scope variation
- ·budget governance policy — sign-off thresholds at each stage
- ·VE policy — when to run, who decides, what trade-offs are acceptable
- ·Variance reporting policy with alert thresholds
- ·DD budget locks the project base; later changes are amendments
- ·VE proposal requires cost/time/quality trade-off documented
- ·Variance above threshold triggers PMO review
- ·Commitment exceeding budget blocks new WO release until reconciled
- ·Concept budget
- ·CD budget
- ·DD budget (project base, locked)
- ·VE proposal register with trade-off data
- ·Variance reports against DD base
- ·Budget snapshots stored against design milestones
- ·Commitment running total updated on WO release and amendment
- ·DD budget approval enables tender release in M14
- ·Variance alerts trigger CPT and DCO review
- ·VE approvals trigger BOQ updates in M10 and amendment workflow in M15
- DCOOwns budget at all stages and VE process
- FinanceBudget approval and variance monitoring
- DesignVE input — cost/time/quality trade-offs
- PMOVariance reporting
- 01Concept budget tied to architectural concept plan
- 02CD budget refinement
- 03DD budget finalisation, signed off as project base
- 04Value engineering reviews at each milestone
- 05Continuous monitoring against WO issuance and billing
- 06Variance alerts when commitment exceeds threshold
Budget at concept does not survive contact with detailed design; VE late.
Budget evolves on the record; VE proposals captured; variance surfaces early.
Worli — CD budget ₹152 Cr (Jan). DD budget ₹147.8 Cr (May). VE round in March reduced concrete grade in non-load-bearing slabs, saving ₹4.2 Cr without quality compromise. Portfolio-level variance −0.8% (47 projects).
- ·Concept budget
- ·CD budget
- ·DD budget (locked base)
- ·VE proposal register with trade-off data
- ·Variance reports
Budget at concept does not survive contact with detailed design. VE decisions are taken late when scope is hard to reduce. Variance triggers come after commitment.